The Little Hawk

Third Floor Addition Almost Finished

A video tour of the newly constructed addition to the third floor.

Innes Hicsasmaz

Innes Hicsasmaz and Naomi Meurice

Hang on for a minute...we're trying to find some more stories you might like.


Email This Story






After seven months of construction, the third floor addition is almost complete. The administration is only waiting on last minute touch ups, like installing blinds and desks. According to Assistant Principal Scott Jespersen, the six new rooms will be used as three social studies and three Spanish classrooms.  The old world language rooms will be occupied by ELL classes, two old social studies rooms will become math classrooms, and English will gain a room on the second floor. Study hall will also be housed in a classroom.

These decisions were based on average number of students per class and available space in classrooms.

 

About the Contributors
Innes Hicsasmaz, Media Editor

Don't mess with me. I was on homecoming court for my "sporty-hippy" aesthetic. I read at a 3rd grade level. I know enough words to subtweet almost all...

Naomi Meurice, Reporter

Hi. I'm a #cool #teen #freshman and I love to write, make videos, and be creative! Catch me in the newslab doing important work literally all the time...

Leave a Comment

If you want a picture to show with your comment, go get a gravatar.




Navigate Left
  • Third Floor Addition Almost Finished

    NEWS

    Student Teacher Profile: Elizabeth Mastroianni

  • Third Floor Addition Almost Finished

    NEWS

  • Third Floor Addition Almost Finished

    City High

    Student Senate Recap: As Election Looms, Juniors Volunteer at Senior Picnic

  • Third Floor Addition Almost Finished

    NEWS

    “Galaxy Nights: May the Fourth Be With You” Prom is a Hit

  • Third Floor Addition Almost Finished

    MULTIMEDIA

    Students Continue to Strike for the Climate

  • Third Floor Addition Almost Finished

    City High

    The 2019 Iowa City Youth Awards

  • Third Floor Addition Almost Finished

    NEWS

    Little Hawk Live: Physics Bridge Breaking

  • Third Floor Addition Almost Finished

    NEWS

    City High introduces Black Lives Matter Club

  • Third Floor Addition Almost Finished

    NEWS

    Problems With Potholes

  • Third Floor Addition Almost Finished

    NEWS

    Teacher Appreciation: Ms. Sherman

Navigate Right
The student news site of Iowa City High School.
Third Floor Addition Almost Finished